100KW off-grid solar power system project in Uganda
December 22, 2023Project Type: Commercial Use
Installation Site: Uganda
Installation Date: September 21, 2023
System components: Lithium Battery, Inverter and Solar Panel Mixed Wholesale in South Africa
Customer feedback: A project manager in the Uganda region was struggling with the problem of power scarcity in the area. Later, he contacted Anern to work out a suitable solution. Anern provided a highly efficient 100KW Lithium battery solar power system, which was successfully put into operation. The problem of unstable power was successfully solved.
Add :5th Floor, Building B, No.2817 Kaichuang Avenue, Science Zone, Huangpu District, Guangzhou, China
Anern Industry Group Limited All Rights Reserved.Xml | Privacy Policy Network Supported